Staging preview — structure and placeholders only. See what content is still outstanding
Skip to content
Alternative Solutions Guide Alberta building permits for innovative products

Content status

Every content slot on the site and whether SSRIA has supplied it yet.

This page is generated from the site itself. Every placeholder on every page is listed below with what is needed, who it comes from and when the proposal expects it. It updates as content is added — there is no second list to keep in step.

31 Content slots
8 In place
0 Draft only
23 Not supplied

26% of the site's content slots are filled.

Page Content item Format State From Due
Alternative Solutions Guide Home page introduction A short orientation paragraph: what the guide is, who produced it, and who it is for. The proposal lists draft text for the introduction and each tool page. Written content Not supplied SSRIA Nov 20, 2026
Placeholder case study A Case study summary Short summary written by SSRIA, 80 to 120 words. Written content Not supplied SSRIA Nov 20, 2026
Placeholder case study B Case study summary Short summary written by SSRIA, 80 to 120 words. Written content Not supplied SSRIA Nov 20, 2026
Placeholder case study C Case study summary Short summary written by SSRIA, 80 to 120 words. Written content Not supplied SSRIA Nov 20, 2026
Introduction to the guide Overview of the guide and suite of tools The proposal specifies an overview of the guide and the full suite of tools. Expect roughly 600 to 900 words. Written content Not supplied SSRIA Nov 20, 2026
How to work through the tools, in order A short walkthrough telling a first-time reader which tool to open first and what each one answers. Written content Not supplied SSRIA Nov 20, 2026
Project credits and NRCan acknowledgement Funding acknowledgement wording and any partner logos required under the NRCan agreement. Written content Not supplied SSRIA Nov 20, 2026
Alberta’s safety codes system Short introduction to the map One or two paragraphs setting up the board below. Written content Not supplied SSRIA Nov 20, 2026
Alberta’s safety codes system Miro board In place SSRIA —
Alternative solutions pathway Short introduction to the flowchart Written content Not supplied SSRIA Nov 20, 2026
Pathway to alternative solutions building permit Miro board In place SSRIA —
Request for Specific Variance How to use the template Guidance on completing the template and what to attach. Written content Not supplied SSRIA Nov 20, 2026
Request for Specific Variance template Google Doc In place SSRIA —
Request for Specific Variance template (PDF) PDF download In place SSRIA —
Comparison of evaluation bodies How to read the comparison Written content Not supplied SSRIA Nov 20, 2026
Overview of STANDATA approved evaluation bodies Google Sheet In place SSRIA —
Code conformity assessment process maps Introduction to the process maps A short note explaining what the maps cover and how they relate to each other. Written content Not supplied SSRIA Nov 20, 2026
APA code conformity assessment process One of the six bodies listed in the SSRIA evaluation sheet. Board not shared yet. Miro board Not supplied SSRIA Nov 9, 2026 overdue
CCMC technical assessment of code compliance Miro board In place SSRIA —
ICC-ES code conformity assessment process Miro board In place SSRIA —
Intertek code conformity assessment process One of the six bodies listed in the SSRIA evaluation sheet. Board not shared yet. Miro board Not supplied SSRIA Nov 9, 2026 overdue
UL Solutions code conformity assessment process One of the six bodies listed in the SSRIA evaluation sheet. Board not shared yet. Miro board Not supplied SSRIA Nov 9, 2026 overdue
QAI code evaluation process Miro board In place SSRIA —
Code sections referring to alternative solutions Safety Codes Council table of code sections Mentioned in the first meeting. Needs the source file and confirmation that SSRIA may republish it. Table Not supplied SSRIA Nov 20, 2026
Technical guide & worked examples Scope section Written content Not supplied SSRIA Nov 20, 2026
Background section Written content Not supplied SSRIA Nov 20, 2026
Preparing an alternative solution Written content Not supplied SSRIA Nov 20, 2026
Worked examples The number of worked examples is unconfirmed. Three are scaffolded to show how the section navigation behaves. Written content Not supplied SSRIA Nov 20, 2026
Submission section Written content Not supplied SSRIA Nov 20, 2026
Appendices Written content Not supplied SSRIA Nov 20, 2026
LRI Technical Guide (PDF) The proposal asks for the guide as an editable document plus a PDF. PDF download Not supplied SSRIA Nov 20, 2026

Open questions

Two dates in the proposal

The “What we need from SSRIA” table gives November 20, 2027 for the LRI technical guide and for the first case study PDFs. Every other date in that table falls in 2026, and a 2027 date would sit after final handover. They are treated here as 2026.

The Miro boards are copies

Every board shared so far is titled “Copy of…” or “Copy…”. The proposal assumes the embedded boards are the source files, so that edits in Miro appear on the site without anyone touching WordPress. Embedding a copy breaks that: the site will keep showing the copy while the original moves on. Worth confirming whether the copies are deliberate.

Boards open on empty canvas

A Miro embed opens at whatever viewport the board was last saved at, and on these boards that is blank space rather than the diagram. Two fixes, either is fine: position each board on its content and save, or send the embed code from Miro’s own Share → Embed dialog, which records the viewport. Until then every embed carries a link out to the board.

Three process maps outstanding

CCMC, ICC-ES and QAI have arrived. APA, Intertek and UL Solutions have not. Those six are the bodies named in the evaluation sheet, which is the best guess at the proposal’s “six or seven”.